Integrated Urban Development Project

Integrated Urban Development Project

Under the Integrated Urban Development Project (IUDP), our team provides comprehensive project management and technical supervision services for the reconstruction of a critical water supply artery in Djizzak City. The assignment encompasses the construction of a 12.5 km steel water conduit (Ø 630mm and Ø 720mm) connecting the "Amir Temur" water intake facilities to the city's distribution point at "Red Bridge".

Key Technical Features & Challenges:

Infrastructure: Installation of steel pipes featuring internal epoxy insulation and external Three-Layer Polyethylene (3LPE) coating, alongside a cathodic protection system to ensure long-term durability.

Complex Routing: The pipeline route involves challenging engineering conditions, including parallel laying along the railroad, a crossing over the Sangzar River, and three automobile road crossings.

Civil Works: Construction of monolithic reinforced concrete chambers and installation of pressure regulators and safety valves.

Assignment Title Djizzak City Bulk Water Supply System Improvements
Country Uzbekistan
Services Construction Supervision
Practice area Water and Irrigation
Start date January 2025
Status In progress
Client Joint Venture «Atinak Engineering Construction Industry and Trade Inc. and Azersutechizattikinti OJSC»
Donor Asian Development Bank
Role in the Assignment Project Management Consultant